Live from Slack

Sprint 42 wrapped.

What shipped, what carried, what's blocked — pulled from Jira and GitHub before the all-hands.

9:41
#engineering 12 members
I
Iris 9:45 AM
@Dash wrap Sprint 42 for the all-hands — what shipped, what's carrying, any blockers?
Dash
Dash App 9:47 AM

Sprint 42 wrap — pulled from Jira and GitHub.

Sprint 42 · Jun 23 – Jul 4 · 14 engineers

Committed: 34 points · Delivered: 31 points · Velocity: 91%

✅ Shipped (14 issues · 11 PRs merged)
  • Mobile load time — ↓38% — lazy-load refactor on the dashboard view. Biggest perf win in two sprints.
  • Bulk export endpoint — new /v2/exports with async job queue; unblocks 3 enterprise customers waiting on this.
  • SSO session hardening — fixes the token validation issue that caused last week's auth incident. Validated against all 4 affected customers.
  • 11 additional bug fixes across billing, notifications, and the mobile app.
⚠️ Carrying to Sprint 43 (3 items)
  • Auth refactor — part 2 (8 pts) — the session store migration. Unblocked now that the SSO hardening is done. Repoint to 5 before planning.
  • Billing pagination fix (3 pts) — deprioritized mid-sprint for the auth work. Affects accounts with 500+ invoices.
  • Dark mode — phase 1 (5 pts) — design handoff delayed by 2 days; dev work starts Monday.
🔴 One active blocker

The new subscription model requires a Stripe webhook change that needs review from the Stripe partner team. ETA from Stripe is Jul 9 — this blocks the billing subscription feature (Sprint 43, 13 pts). If it slips, the feature misses the Jul 18 release window.

Want this formatted for the sprint retrospective doc, or posted as a summary in #product?

🚀 5 🙌 3
+ Message #engineering
Try Dash on your Slack Chat with Dash, the AI teammate that works inside Slack.